Horizontal
installation
Slide in via cradle
The pods are placed onto load moving skates within a specially prepared cradle. The cradle is then lifted with the use of a crane (supplied by main contractor) to the designated access point and secured to the building.
.
.
Slide in via Loading Platform
The pods are craned onto loading platforms situated at each floor access point (supplied by main contractor)
.
.
Slide in via Forklift
The pods are lifted using a forklift directly from the delivery lorry onto moving skates positioned at the specified access point (Forklift supplied by main contractor).